The following bid tabs have been provided by the noted engineering consultant firms.
For further information, you should contact
the noted project engineer directly.
Initial Advertisement
Date
|
|
Bid
Date |
Municipality
(Loan / Grant) |
Engineering Firm
(Engineer)
&
Engineering Services Agreement
(PDF)
|
Contract Number
(Type of project)
|
Number of Bids
|
Award Amount (Contractor) |
Contract Signed
Date |
|
YEAR 2009 |
| 7/28/09 |
8/18/09
11:00 am |
8/27/09
2:00 pm |
|
Leach Engineering Consultants, PA
( William Dawson, P.E.)
PDF
|
Contract 09-1B
(
Arsenic & Manganese Removal Water Treatment Facility )
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of furnishing and installing a solar powered mixer in the Village of Barton, VT potable raw water reservoir.
|
| 6/29/09 |
none |
8/3/09
2:00 pm |
Village of Barton
(AR3-038)
|
Leach Engineering Consultants, PA
( William Dawson, P.E.)
PDF
|
Contract 09-1
(Solar Powered Reservoir Mixer)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of furnishing and installing a solar powered mixer in the Village of Barton, VT potable raw water reservoir.
|
| 7/1/09 |
none
|
7/30/09
10:00 am |
Castleton Fire District #1
(AR3-XXX)
|
SVE Associates
( Kevin Smith, P.E.)
PDF
|
Contract No.2
(Water Meters Installation)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of varies sizes meters and miscellaneous appurtenances.
|
| TBA |
7/14/09
10:00 am |
7/27/09
2:00 pm |
Morrisville Water & Light
(AR3-023)
|
Weston & Sampson Engineers, Inc.
( Kenneth J. Bisceglio, P.E.)
PDF
|
Contract No. 1
(Water System Improvements- High Service Area)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of construction of a new chemical feed storage building, new access road, new waterline, new chemical feed piping and manhole, electrical, and miscellaneous appurtenances.
|
| 6/25/09 |
7/13/09
2:00 pm |
7/25/09
10:00 am |
Village of Poutney
(AR3-XXX)
|
Forcier Aldrich & Assoc.
( Joe Duncan, P.E.)
PDF
|
Contract No1
(Water System Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of the construction of the York / Norton Water Improvements of approximately 2,600 linear feet of new 8” DI CL 52 water main and all miscellaneous appurtenances.
|
| 6/10/09 |
6/30/09
1:00 pm |
7/21/09
1:00 pm |
City of South Burlington
(AR1-067)
|
Hoyle, Tanner & Assoc., inc.
(Eugene J. Forbes, P.E.)
PDF
|
Contract No. 1
(Wastewater Treatment System Upgrade)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of the construction of an upgrade and expansion of the headworks, primary, biological nutrient removal, secondary, filtration, disinfection, sludge digestion and handling facilities and miscellaneous appurtenant work at the Airport Parkway Wastewater Treatment Facility.
|
| 6/10/09 |
6/24/09
9:00 am |
7/9/09
2:00 pm |
Town of Hardwick
(AR3-XXX)
|
Forcier Aldrich & Assoc.
(Jason Booth, P.E.)
PDF
|
Contract No. 1
(Water System Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of the installation of approximately 1600 linear feet of 8” waterline, approximately 1200 linear feet of 10” waterline, and reconnection of existing services and appurtenances on South Main Street.
|
| 6/8/09 |
6/25/09
10:00 am |
7/8/09
10:00 am |
Village of Waterbury
(AR3-XXX)
|
Charles J. Grenier
Consulting Engineer, PC
( Charles J. Grenier, P.E.)
PDF
|
Contract No. 1W
(Water System Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of construction Municipal water main replacement from Blush Hill Reservoir to O’Hear Court. 3100’ of direct bury 10” ductile iron water line with two (2) Interstate tunnel crossings.
|
| TBA |
TBA
|
TBA
|
So. Burlington Quarry Ridge Stormwater Pond Retrofit Project
(AR1-014)
|
Trudell Consulting Engineers
( Dick Trudell, P.E.)
|
Small Purchase
(Stormwater Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of rehabilitation and improvements to an existing stormwater retention and treatment system originally built by the Quarry Ridge estates in South Burlington.
|
| 6/1/09 |
6/17/09
10:00 am |
6/30/09
1:00 pm |
Town of Proctor
(State Grant Project)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
PDF
|
Contract No. 1
(WWTF Phosphorus Removal Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of construction of a new chemical feed storage building, new access road, new waterline, new chemical feed piping and manhole, electrical, and miscellaneous appurtenances.
|
| |
5/26/09
10:00 am |
6/19/09
3:00 pm |
Harwood Union High School
(AR3-002)
|
Weston & Sampson Engineers, Inc.
( David Allerton, P.E.)
PDF
|
Contract
(Water System Upgrades)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of installation of chlorine disinfection, two new booster pumps, new VFD drive motor controls, the modification of the existing hydropneumatic tank to an atmospheric storage tank, the interconnection of the existing hydropneumatic tank and the existing 15,000-gallon water storage tank, and the draining, cleaning and inspection of the existing 15,000-gallon water storage tank.
|
| |
6/4/09
2:30 pm |
6/18/09
3:00 pm |
|
Green Mountain Engineering
(Alan Huizenga, P.E.)
PDF
|
Contract #2
(Water Meters and Appurtenances)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of installations of the following: 67 - 5/8" water meters installed; 8 -5/8" water meter w/ meter pit installed; 5 - 5/8" water meters delivered; 5 - 3/4" water meters installed; 2 - 1 1/2" water meter w/ meter pit installed; 50 - thermal expansion tank installed; 30 C.Y. of misc. excavation; 1 - lump sum price for bonds & 1- lump sum price for meter reading, billing sytem and software.
|
| |
6/4/09
1:00 pm |
6/18/09
2:00 pm |
|
Green Mountain Engineering
(Alan Huizenga, P.E.)
PDF
|
Contract #1
(Water Distribution Upgrades)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of the construction of a new, cast-in-place Concrete reservoir, booster pump system and controls, construction of 1-inch, 2-inch and 4-inch waterlines and house services, and renovation of an existing building, site work and waterline road crossings.
|
| |
6/4/09
9:00 am |
6/18/09
9:00 am |
St. George FD#1
(AR3-016)
|
Green Mountain Engineering
(Alan Huizenga, P.E.)
PDF
|
Contract #1
(Water System Upgrades)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of installation of two (2) new pre-cast concrete reservoirs, pumping facilities, wood frame buidling and abandonment of existing facilities. Blow-offs and gate valves will be installed on the distribution system.
|
| |
5/29/09
3:00 pm |
6/12/09
3:00 pm |
|
Dubois & King, Inc.
( Steven E. Mackenzie, P.E.)
PDF
|
Contract
(Water System Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of water system improvements including modifications to the well and well house, installation of chlorine disinfections system, 6" and 8" ductile iron water main and appurtenances.
|
| |
5/28/09
10:00 am |
6/10/09
10:00 am |
Morrisville Water & Light
(AR1-003)
|
Forcier Aldrich & Assoc.
( Joe Duncan, P.E.)
PDF
|
Contract
(Wastewater Collection System Upgrades)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of construction of Sewer System Rehabilitation, Contract 4, which consists of replacement of approximately 2,000 linear feet of vitrified clay (VC) gravity sewers with new 8” PVC SDR 35, new sewer manholes, new sewer laterals, and all miscellaneous appurtenances.
|
| |
5/21/09
11:00 am |
6/8/09
11:00 am |
Village of Johnson
(AR1-011)
|
Otter Creek
Engineering ,Inc.
( Peter DeGraff, P.E.)
PDF
|
Contract
(Power House Bridge Sewer Replacement)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of replacement of gravity sanitary sewer main crossing the Gihon River at the Power House Bridge, project Includes 150 feet of ductile iron sewer, of which approx. 50 feet is insulated, restrained mechanical joint pipe
|
| |
5/19/09
2:00 pm |
6/3/09
2:00 pm |
Town of Castleton
(AR1-012)
|
SVE Associates
( Phil Douglas, P.E.)
PDF
|
Contract
(South Street Drainage & Pavement Improvement)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of drainage and paving improvements to South Street in the Town of Castleton, VT including, but not limited to, new catch basins, storm drain piping, a culvert, headwall, pavement, asphalt curbing, striping and associated work.
|
| |
None |
6/8/09
2:00 pm |
Essex Jct Village
(AR1-004)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
PDF
|
Contract
(WWTF Equipment Replacement)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of Wastewater Treatment Facility Aeration Blower Replacement to include: the purchase of one (1) new turbo blower system (equipment only) for Owner installation
|
| |
5/29/09
9:00 am |
6/5/09
1:00 pm |
Essex Jct Village
(AR1-004)
|
Hoyle, Tanner & Assoc., inc.
(Eugene J. Forbes, P.E.)
PDF
|
Contract
(Wastewater Collection System Rehab.)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of the construction of Wastewater Collection System Rehabilitation utilizing Cured-In-Place Lining, Cured-In-Place Point Repairs, Test & Seal and Manhole Lining in various locations.
|
| |
5/1/09
11:00 am |
5/19/09
10:00 am |
Village of Ludlow
(RD & SRF
No ARRA Funds Project 2009)
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
PDF
|
Contract No. 2
(Water Tank & Distribution System Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of
installation of a 400,000 gallon pre-cast, pre-stressed concrete type III water storage tank and 700 linear feet of water main and appurtenances
|
| |
5/1/09
10:00 am |
5/19/09
10:00 am |
Village of Ludlow
(RD & SRF ARRA Project 2009)
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
PDF
|
Contract No. 1
(Water Distribution System Improvements)
|
|
|
TBA |
|
CONTRACT DESCRIPTION: The project consists of installation of 14,700 linear feet of replacement water main and appurtenances.
|
| 4/20/09 |
5/1/09
10:00 am |
5/19/09
1:00 pm |
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
PDF
|
Contract No. 1
(Wastewater System Improvements)
|
|
$437,604.00
(NECCO, Inc.)
|
TBA |
|
CONTRACT DESCRIPTION: The Alder Brook Pump Station project consists of the renovation of the existing Pump Station Building, replacement of three (3) sewage influent pumps and related discharge piping and valves, installation of three (3) varaible frequency drives units, mechanical and electrical improvements, a new package flow meter structure and miscellaneous appurtenances.
|
| 4/15/09 |
4/22/09
2:00 pm |
5/6/09
12:00 pm |
Deerfield Valley Elementary School
( AR3-012)
|
SVE Associates .
( Andrew Geffert, P.E.)
PDF
|
Contract No. 1
(Water System Improvements)
|
|
SP1 - $77,001.00
( Zaluzny Excavating Corp)
SP2 - $45,325.00
(Lane Plumbing & Heating)
|
5/28/09 |
|
CONTRACT DESCRIPTION: The project consists of disinfection, water meter, improvements to storage tank, and security measures.
|
| |
4/16/09
10:00 am |
4/30/09
1:00 pm |
Town of Springfield
(AR3-028)
|
Forcier Aldrich & Assoc.
( Joe Duncan, P.E.)
PDF
|
Contract No. C1
(Water System Improvements)
|
|
$1,787,115.80
(Zaluzny Excavating)
|
5/21/09 |
|
CONTRACT DESCRIPTION: The project consists of the construction of approximately 9,500 linear feet of 16” D.I. waterline, 850 linear feet of 20” HDPE waterline, 750 linear feet of 8” D.I. waterline, 600 linear feet of 12” D.I. waterline, one (1) new pressure reducing valve vault and miscellaneous appurtenances along VT Route 106 (River Street).
|
| |
4/13/09
1:30 pm |
4/29/09
2:00 pm |
Town of Springfield
(AR1-002)
|
Stantec
(Greg Kepler, P.E.)
PDF
|
Contract No. 6
2009-1
(CSO Abatement
Phase 2 Improvements)
|
|
$2,500,063.50
(S.U.R. Construction West, Inc.)
|
5/28/09 |
|
CONTRACT DESCRIPTION: The project consist of the construction of CSO Abatement Phase 2, Contract 6, 2009-1 including, but not limited to, excavation, backfilling, grading, seeding and restoration of paving; installation of approximately 8700 linear feet of storm sewer pipe, 65 manholes, 60 catch basins, 5 concrete drain inlets, 5100 linear feet of 6-inch and 8-inch ductile iron water main, 75 water services, water main abandonment, 12 fire hydrants, 600 linear feet of 8-inch PVC gravity sewer pipe, and all other work specified herein drawings ans specs.
|
| |
4/14/09
10:00 am |
4/28/09
1:00 pm |
City of St. Albans
(AR1-008)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
PDF
|
Contract No. 1
(Wastewater Treatment Facility Upgrade)
|
|
$1,919,620
(Neagley & Chase)
|
5/20/09 |
|
CONTRACT DESCRIPTION: The project consists of upgrades of the exisiting wastewater treatment facility to include a new biosolids management facility, upgrades to the exisiting trickling filter system, installation of new sludge storage and transfer pumps, replacement of the boiler/heat exchanger for the anaerobic digesters, and miscellaneous appurtenances.
|
| |
4/8/09
9:00 am |
4/23/09
1:00 pm |
Town of Springfield
(RD Loan Project)
|
Forcier Aldrich & Assoc.
( Joe Duncan, P.E.)
PDF
|
Contract No. C2
(Water System Improvements)
|
|
$862,929
( Kingsbury Companies)
|
5/21/09 |
|
CONTRACT DESCRIPTION: The project consists of the construction of approximately 2,000 linear feet of 16” D.I. waterline near the Union Street School, 2,700 linear feet of 12” D.I. waterline on Summer Street and near the Springfield High School, 2,200 linear feet of a new gravel access road, two (2) new pressure reducing valve vaults, and miscellaneous appurtenances.
|
| |
2/19/09
10:00 am |
3/12/09
12:00 pm |
Timberline Condominium Association
(RF3-141)
|
Phelps
Engineering, Inc.
( Jeremy Rathbun, P.E.)
PDF
|
Contract No. 1
(Water System Improvements)
|
|
$135,828
(G.W. Tatro Construction)
|
3/19/09 |
|
CONTRACT DESCRIPTION: The project consist of the installation of approximately 800 linear feet of water main, a 7,500-gallon storage tank; pumping station; building and six water service connections.
|
|
Pre-Bid
Date |
Bid
Date |
Municipality
(Loan / Grant) |
Engineering Firm
(Engineer) |
Contract Number
(Type of project)
|
Number of
Bidders |
Award Amount (Contractor) |
|
Bid
Item
Breakdown |
YEAR 2008 |
|
11/25/08
9:00 am |
12/10/08
5:00 pm |
|
Weston & Sampson
( Michael A. Smith, P.E..)
|
DP1,DP2, DP3, DP4
( Water Systems Improvement)
|
|
$152,291
(Chevalier Drilling Co., Inc)
|
|
|
| CONTRACT DESCRIPTION: The project consist of the installation of a booster system, waterline extension and two water storage tanks. Direct Purchase No. 1 (DP1) - Excavation; Direct Purchase No. 2 (DP2) - Electrical; Direct Purchase No. 3 (DP3) – Plumbing; Direct Purchase No. 4 (DP4) - Carpentry. |
| |
None |
10/10/08
2:00 pm |
Town Of Shelburne
(RF1-XXX)
|
Civil Engineering Associates,Inc.
( Steve A. Vock, P.E.)
|
Contract
(Bay Road Sewer Improvements)
|
|
$83,000
(Todd Chagnon Construction, Inc.)
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of water storage tanks, booster pumps, pumps control and disinfection systems, building, sitework and other related work.
|
|
None |
9/25/08
2:00 pm |
Village of Bellows Falls
(RF3-123)
|
Dufresne & Assoc., PC
( Roger A. Ward.)
|
Contract No.
( Water Treatment Facility Improvements)
|
3 |
$130,200
( Penta Corporation)
|
|
|
| CONTRACT DESCRIPTION: The project consists of filter rehabilitation and filter basin improvements to the Water Treatment Plant Facility. |
| |
8/29/08
10:00 am |
09/12/08
10:00 am |
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
|
Contract No. 1
(Water System Improvements)
|
|
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of water storage tanks, booster pumps, pumps control and disinfection systems, building, sitework and other related work.
|
| |
8/29/08
10:00 am |
09/12/08
10:00 am |
Grandview Acres Water System, Inc. District No. 1
( RF3-106)
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
|
Contract No. 1
(Water System Improvements)
|
|
$149,800.00
(The Beldon Company)
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of water storage tanks, booster pumps, pumps control and disinfection systems, building, sitework and other related work. |
|
8/28/08
10:00 am |
09/11/08
10:00 am |
Cuttingsville
Fire District No. 1
( RF3-190)
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
|
Contract No. 1
( Water Systems Improvements)
|
1 |
$200,570.00
(The Beldon Company)
|
|
|
| CONTRACT DESCRIPTION: The project consists of the reconstruction of an exisiting disinfection/control building. |
| |
8/25/08
10:00 am |
09/10/08
10:00 am |
East Dorset
Fire District No. 1
( RF3-143)
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
|
Contract No. 1
(Water System Improvements)
|
|
$104,980.00
(The Quinn Company)
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of approximately 700 linear feet of 4-inch ductile iron water main along Pleasant Street Extension and the construction a new control/chlorine injection building on the existing water storage tank. |
|
7/16/08
10:00 am |
7/30/08
3:00 pm |
Castleton
Fire District #1
(RF3-173)
|
SVE Associates
( Kevin Smith, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
3 |
$1,237,522.20
(Munson Earth-Moving Corp)
|
|
|
| CONTRACT DESCRIPTION: The project consists of the installation of 3,593 linear feet (LF) of 12 inch ductile iron (DI) pipe:, 867 LF of restrained mechanical joint 12 inch DI pipe; 625 LF of 10 inch DI pipe, 270 LF of restrained mechanical joint 12 inch DI pipe; 32 LF of 8 inch DI pipe; 237 LF of restrained mechanical joint 8 inch DI pipe; 45 LF of 6 inch DI pipe; 99 LF of restrained mechanical joint 12 inch DI pipe; 6 LF of 3 or 4 inch DI pipe; 224 LF of restrained mechanical joint 3 or 4 inch DI pipe; 72 LF of 36 inch DI pipe; 40 LF of casing; 4000 LF of temproray water service; 6 hydrants; with varies sizes of fittings, valves, copper tubing with misc. appurtenances; some rock excavation/removal and paving. |
| |
6/18/08
10:30 am |
07/9/08
10:30 am |
Arlington Water Co
( RF3-143)
|
Otter Creek
Engineering ,Inc.
( Mark Youngstrom, P.E.)
|
Contract No. 1
(Water System Improvements)
|
|
$665,642
(United Construction Corp.)
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of approximately 5,000 linear feet of 4 inch to 8 inch ductile iron water main, including railway crossing and appurtenances. |
| |
None |
06/12/08
1:00 pm |
Town of Essex
(CWD STAG - EPA Grant XP971011-01 & XP971226-01)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
|
Contract
(Colbert Street
Stormwater Project)
|
|
$ 64,473
(Dirt Tech Company, LLC)
|
|
|
CONTRACT DESCRIPTION: Project consists of the construction of a new stormwater treatment system - Vortechs swirl separator chamber ; 6 ft diameter precast drain manhole, 4 ft diamter precast catchbasin; 24 inch, 18 inch and 12 inch PE stormdrain; 4 inch PVC drain, permanent bituminous, concrete curb and sidewalk repair; misc., extra grade earth excavation. |
|
6/2/08
11:00 am |
6/12/08
11:00am |
|
Leach Engineering
(Gary Leach ,P.E.) |
Contract No. 1
( Water System Improvements)
|
6 |
$275,540
(E.A. Grandfield)
|
|
|
CONTRACT DESCRIPTION: The project consists water system improvements including not limited to replacement of 1740 linear feet of 6 inch water main with separate 4 inch water mains for a high pressure and gravity pressure system and reconstruction of the existing pump station to an above grade location. |
| |
None |
05/28/08
2:00 pm |
Town of Shelburne
( RF1-122)
|
Civil Engineering Associates,Inc.
( Steve A. Vock, P.E.)
|
Contract
(Longmeadow Pump Station Improvements)
|
|
$ 178,300
(Island Excavating Corporation)
|
|
|
CONTRACT DESCRIPTION: The project consists of the demolition of an old wastewater pumping station and installation of a new prefabricated pump station, including new emergency storage tank and 8” gravity sewer. |
|
4/29/08
10:00 am |
5/15/08
10:00 am |
Warren Elementary School
(RF3-171)
|
Forcier Aldrich & Assoc.
( Brad Aldrich, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
5 |
$59,925.00
( Kingsbury Construction
Company )
|
|
|
| CONTRACT DESCRIPTION: The project consists of the installation of new storage reservoir, waterlines, stand-by disinfection system, interior plumbing and electrical controls improvements and misc. appurtenances. |
|
4/4/08
9:00 am |
4/30/08
1:30 pm |
Tri-Park Coop.
Housing Corp.
Mountain Home MHP
|
SVE Associates
( John E. Goodell , P.E.)
|
Contract No. 2A
( Sewer service lines & connection improvements)
|
2 |
$337,293.00
( Zaluzny Excavating Corporation )
|
|
|
| CONTRACT DESCRIPTION: The project consists of the installation of approximately 5000 ft of 4 inch sewer service lines with clean-outs and 110 sewer service connections at homes. |
| |
4/16/08
9:00 am |
04/30/08
1:30 pm |
Town of Brattleboro
Mountain Home MHP
( RF1-104)
(RF3-163)
|
SVE Associates
( John E. Goodell , P.E.)
|
Contract No. 2
( Water/Sewer Systems Improvements)
|
|
$2,496,408.20
( Zaluzny Excavating Corporation )
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of approximately 6200 ft of 8 inch sewers, 2000 ft of 4 inch sewer service lines, 7800 ft of 8 inch ductile water main, ductile iron water main, 15 fire hydrants, 110 water service connections including connection at home, booster pump replacement and pump station piping work, roadway reclaiming and paving. |
|
4/16/08
9:00 am |
4/30/08
9:30 am |
Tri-Park Coop.
Housing Corp.
Mountain Home MHP
|
SVE Associates
( John E. Goodell , P.E.)
|
Contract No. 1A
( Sewer service lines & connection improvements)
|
3 |
$405,300.00
( Lamoille Construction)
|
|
|
| CONTRACT DESCRIPTION: The project consists of the installation of approximately 5700 ft of 4 inch sewer service lines with clean-outs and 168 sewer service connections at homes. |
| |
4/16/08
9:00 am |
04/30/08
9:30 am |
Town of Brattleboro
Mountain Home MHP
( RF1-104)
(RF3-163)
|
SVE Associates
( John E. Goodell , P.E.)
|
Contract No. 1
( Water/Sewer Systems Improvement)
|
|
$2,797,001.00
(Willey Earthmoving Corporation)
|
|
|
CONTRACT DESCRIPTION: The project consists of the installation of approximately 1600 ft of 15 inch sewers, 1200 ft of 12 inch sewers, 5800 ft of 8 inch sewers, 2700 ft of 4 inch sewer service lines, 6500 ft of 8 inch ductile water main, 1300 ft of 4 inch ductile iron water main, 13 fire hydrants, 168 water service connections including connection at home, roadway reclaiming and paving. |
|
4/4/08
10:00 am |
4/23/08
1:00 pm |
Village of Bellows Falls
(RF3-169)
|
Forcier Aldrich & Assoc.
( John Forcier, P.E.)
|
Contract No. 4
( Watermain extension)
|
7 |
$937,500
(Bazin Bros. Trucking, Inc.)
|
|
|
| CONTRACT DESCRIPTION: The project consists of waterline extension of approximately 6,000 linear feet of 12 inch ductile iron. waterline and 3,000 linear feet of 8 inch ductile iron waterline and appurtenances to North Westminister Water System. |
| |
4/7/08
10:00 am |
04/17/08
1:00 pm |
Town of Brighton
(RF3-107)
|
Forcier Aldrich & Assoc.
( Joseph J. Duncan, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
|
$1,187,915.00 (Munson Earth-Moving Corporation) |
|
|
CONTRACT DESCRIPTION: The project consists of the construction of approximately 14,500 linear feet of 8 inch and 10 inch waterline and miscellaneous appurtenances around Island Pond lake. |
| |
3/6/08
10:00 am |
03/24/08
1:00 pm |
Town of Proctor
(RF1-107)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
|
Contract No. 1
( CSO Abatement Project)
|
|
$ 377,175.00
(The Belden Company)
|
|
|
CONTRACT DESCRIPTION: The project consists of the upgrade of the existing Park Pump Station, sitework, a new 8 ft diameter wetwell and approximately 740 linear ft of 6 inch forcemain. |
|
2/21/08
10:00 am |
3/18/08
1:00 pm |
Town of Fair Haven
(RF3-155)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
|
Direct Purchase 4
( Water Treatment Facility Electrical Upgrades)
|
5 |
$ 24,890.00
(Slate Valley Electric, Inc)
|
|
|
| CONTRACT DESCRIPTION: The project consists of electrical upgrades to the Town of Fair Haven Water Treatment Facility |
| |
1/22/08
1:00 pm |
02/5/08
1:00 pm |
Town of Pownal
(RF1-064/VT-328/EPA-XP-98177001-0)
|
Forcier Aldrich & Assoc.
( Joe Duncan, P.E.)
|
Contract No. 2C
( Pownal Village Sewer System )
|
|
$ 1,264,919.50
(J.P. Sicard, Inc.)
|
|
|
CONTRACT DESCRIPTION: The project consists of the connection of individual house services to the existing sewer system consisting of approximately 7,000 linear ft. of gravity sewer, 630 linear ft of forcemain, one (1) grinder pump stations and one (1) duplex wastewater pump stations; sitework, electrical work, control and telemetry, and miscellaneous appurtenances, and individual sewer services on private property, including septic tank deactivation. |
| |
1/10/08
11:00 am |
1/30/08
11:00 am |
Town of Middlebury
(RF1-118)
|
Hoyle, Tanner & Assoc., inc.
(Eugene J. Forbes, P.E.)
|
Contract No. 1
( Sanitary Sewer Force Main Systems Improvement)
|
2 |
$ 938,628.00
(Green Mountain Pipeline Services.)
|
|
|
CONTRACT DESCRIPTION: Project consists the construction of Rogers Road sanitary force main repairs by structural lining. |
|
Pre-Bid
Date |
Bid
Date |
Municipality
(Loan / Grant) |
Engineering Firm
(Engineer) |
Contract Number
(Type of project)
|
Number of
Bidders |
Award Amount (Contractor) |
|
Bid
Item
Breakdown |
YEAR 2007 |
| |
|
12/16/07
10:00 pm |
Fairfax Heights Water Cooperative
(RF3-158)
|
Green Mountain Engineering
(Alan Huizenga, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
8 |
$ 161,000
( Todd Chagnon Construction Inc.)
|
|
|
CONTRACT DESCRIPTION: Construction consist of making improvements to their existing water storage facility, sources of water supply, treatment building and controls. |
|
|
11/27/07
1:00 pm |
Town of Fair Haven
(RF3-155)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
|
Direct Purchase 3
( Water Treatment Plant ABW Filters Upgrades)
|
|
$ 309,900.00
( Penta Corporation)
|
|
|
| CONTRACT DESCRIPTION: Work includes is to furnish all labor, material, equipment, and incidentals fo the upgrade of two (2) existing ABW Filters ( Automatic Backwash Filters) originally manufactured by Infilco Degremont, Inc. |
| |
|
8/30/07
11:00 pm
(re-bid) |
Notch Brook Homeowners Assoc.
(RF3-115)
|
Leach Engineering
(Gary Leach ,P.E.)
|
Contract #2
(Water System Improvements)
|
3 |
$ 227,625.00
( J.P. Sicard, Inc.)
|
|
|
CONTRACT DESCRIPTION: Construction consist of an installation of several water services connections (corporations, curb stops, services and water meters) and appurtenances with pavement replacement. |
| |
|
7/24/07
3:00 pm |
Eden Central School
(RF3-149)
|
ESPC
(Eric Sandblom, P.E.)
|
Contract No. 1
( Water Systems Improvement) |
|
$20,350.46
( Superior Water System Inc.)
|
|
|
CONTRACT DESCRIPTION: Construction consists of re-piping the well line to the building for chlorination and then to the reservoir tank. Work will include installation of a water softener unit, a hypo chlorinator and pump and a new submersible pump with floats in the existing reservoir tank. Also included are improvements to the existing access hatch and overflow pipe and other minor improvements. |
| |
|
7/16/07
10:00 pm |
Monkton Central School
(RF3-TBA)
|
Green Mountain Engineering
(Alan Huizenga, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
TBA |
Reject all bids |
|
TBA |
CONTRACT DESCRIPTION: Construction consist of an installation of ultraviolet disinfection system, water softening equipment, storage tank modifications and appurtenances. |
| |
|
6/8/07
1:00 pm |
City of Newport
(RF1-075 &
RF3-129)
|
Forcier Aldrich & Assoc.
( Brad Aldrich, P.E.)
|
Contract 6
(Water & Wastewater Improvements SCADA System)
|
2 |
$ 119,840.00
(Electrical Installations, Inc.)
|
|
|
CONTRACT DESCRIPTION: Contract consist of SCADA Systems with Remote Web Access Improvements. |
| |
|
5/4/07
2:00 pm |
Town of Shelburne
(CWD STAG - EPA Grant XP971011-01 & XP971226-01)
|
Trudell Consulting Engineers
(Jeremy M. Matosky, P.E.)
|
Phase 1, Part 2
(Stormwater Improvements)
|
5 |
$ 35,411
(Walker Construction)
|
|
|
CONTRACT DESCRIPTION: Monroe Brook Stormwater Improvement Project -- Hullcrest Park Improvements described generally as site landscaping work consisting of recontouring the grade of the top and side slopes of the park area, topsoiling disturbed surfaces, seeding and mulching for turf establishment of disturbed areas, construction of a 5'ft wide gravel path, and planting trees and shrubs.
|
|
|
4/27/07
1:00 pm |
Town of Fair Haven
(RF3-155)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
4 |
$ 976,485.87
(Markowski Excavating Inc.)
|
|
|
CONTRACT DESCRIPTION: Project consist of 4 inch, 6 inch, 8 inch, 10 inch ductile iron water main improvements with water system appurtenances; earth work; road and sidewalk resurfacing; incidental work with sum lump sum items with bid alternatives. |
|
|
4/27/07
2:00 pm |
City of South Burlington
(EPA STAG Grant XP971011-01)
|
Hoyle, Tanner & Assoc., Inc.
(Charles H. Swanson, P.E.)
|
Contract
( Stormwater Improvement)
|
4 |
$ 859,578.00
(N.L. Chagnon, Inc.)
|
|
|
CONTRACT DESCRIPTION: The project is for the construction of Farrell Street/Potash Brook Stormwater Improvements which the project encompasses the replacement of the Farrell Street/Potash Brook culvert and the construction of the following adjacent stormwater treatment practices; a wet extended detention pond; a bioretention facility and an underground swirl concentration device, and all appurtenant work. |
|
|
04/17/07 1:00 pm |
Village of Essex Jct. ( EJSTW-001 STAG# XP971226-01/STW-001) |
Donald L. HamlinConsulting Engineers, Inc. (Jeffrey P. Kershner, P.E.) |
Contract
( Stormwater Improvement) |
9 |
$ 286,463
(Don Weston Excavating, Inc)
|
|
|
CONTRACT DESCRIPTION: Project consists of the installation of 1,050 feet of 42 inch HDPE pipe, Vortechs TM Model 5000 Stormwater Treatment System, one 4 inch diameter manhole, three 6 foot diameter manholes and one 8 ft diameter. The stormwater treatment system will discahrge to Indian Brook via closed system. |
|
|
|
Town of Hardwick
(VT-334)
|
Forcier Aldrich & Assoc.
( Brad Aldrich, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
9 |
$ 581,102
(T. Buck Construction)
|
|
|
CONTRACT DESCRIPTION: Contract is for the construction of the Wastewater Treatment Facility Phosphorus Removal Improvements. The project consists of the construction of a new chemical feed/storage building, access road, modification of the existing control building piping for chemical injection, and miscellaneous appurtenances. |
| |
|
03/28/07
1:00 pm |
Town of Marshfield
(WS-VT-181)
|
Forcier Aldrich & Assoc.
( Wayne Elliott, P.E.)
|
DP1,DP2, DP3
( Water Systems Improvement)
|
|
DP1- $ 49,900
(Onion River Excav.)
DP2 -$ 24,400
(Giguere Contracting)
DP3 - $ 38,900
(AdedgeTech. Inc.)
|
|
PDF
(DP1-size 93 KB)
PDF
(DP2-size 93 KB)
PDF
(DP3-size 93 KB)
|
CONTRACT DESCRIPTION: Project consists of installtion of a Water System Uranium Treatment System with separate contract for the following: Direct Purchase No. 1 (DP1) - Foundation and Related Site Work Direct; Purchase No. 2 (DP2) - Building Addition Approval; Direct Purchase No. 3 (DP3) – Uranium Treatment Equipment. |
| |
|
03/27/07
1:00 pm |
Town of Pownal
(RF1-064/VT-328/
EPA-XP-98177001-0)
|
Forcier Aldrich & Assoc.
( Brad Aldrich, P.E.)
|
Contract No. 6
( Pownal Center Sewer System North)
|
2 |
$ 1,755,698
(Petricca Construction)
|
|
|
CONTRACT DESCRIPTION: Project consists of the connection of individual house services to the exisiting sewer system consisting of approximately 6,000 linear ft of gravity sewer, 2,000 linear ft of forcemain, two grinder pump stations and two duplex wastewater pump stations; sitework electrical work, control and telemetry, and misc. appurtenances, individual sewer services on private property and including septic tank deactivation. |
| |
|
03/21/07
11:00 pm |
Town of Montgomery
(STAG # EM-7147301)
|
Leach Engineering
(Ken Trask,P.E.)
|
Contract
(Water System Improvements)
|
4 |
$1,496,218.50
(S.D. Ireland Brothers Corp.)
|
|
|
CONTRACT DESCRIPTION: Project consists of water system improvements including a water treatment plant, storage tank, two booster pump stations, water mains, telementry and appurtenances. |
02/05/07 10:00 am |
|
02/05/07 10:00 am |
Highgate Elementary School
(RF3-156P)
|
Green Mountain Engineering
(Alan Huizenga, P.E.)
|
Contract No. 1
( Water Systems Improvement)
|
7 |
|
|
|
CONTRACT DESCRIPTION: Construction consist of an installation of stand-by disinfection system, controls, water storage upgrade, waterlines and appurtenances. |
| |
|
01/24/07
2:00 pm |
Town of Springfield
(RF1-089 &
RF3-060) |
Stantec
(Greg Kepler, P.E.) |
2006-1
|
|
$ 1,939,748
(Petricca Construction) |
|
|
CONTRACT DESCRIPTION: CSO Abatement - Phase 2 consists of excavation, backfilling grading, seeding and restoration of paving, installation of approx. 7,400 linear ft of storm sewer piping, 51 manholes, 58 catch basins, 18 concrete drain inlets, 2,100 inear ft of 8 inch ductile iron water main, 118 water services, water main abandonment, 9 hydrants and 400 linear ft of 8 inch PVC gravity sewer pipe.
|